You Have A New Order, But No Available Capacity: Four Alternatives Before Turning Down The Project

← Back to Newsroom

A new order can arrive when your machines are already committed, available tonnage is insufficient, the mold limits production, or the number of cavities cannot support the required volume. Before turning down the project, there are several alternatives worth evaluating.

The Problem Is Not Always a Lack of Capacity

In an injection molding operation, an investment decision should begin with the part that needs to be produced and the capacity already available. Tonnage, mold dimensions, expected volume, resin, cycle time, number of cavities, and machine availability are all part of the same equation. Investing in equipment without evaluating how these factors fit together can simply move the bottleneck from one area to another and delay the startup the investment was meant to accelerate. Before assuming that a new order requires new equipment or has to be turned down, manufacturers should consider four alternatives.

1. Review Scheduling and Existing Capacity

The first alternative is to determine whether capacity is truly unavailable or whether some of it can be freed up. Reviewing machine utilization, cycle times, mold changes, shift availability, and production scheduling may reveal opportunities to absorb some of the additional volume without immediately adding another asset. The goal is not to push existing equipment beyond its limits. It is to use production data to identify where the actual capacity constraint exists.

2. Evaluate Available Used Machinery

If the existing operation cannot absorb the new order, an available used machine may offer another alternative to waiting for a new machine to be manufactured and delivered. The evaluation should begin with the actual requirements of the project, including tonnage, shot capacity, platen dimensions, tie-bar spacing, mold height, controls, and process compatibility. Transportation, installation, startup, maintenance, and the time required to produce an acceptable part should also be considered. Purchase price alone does not determine the true cost of adding production capacity.

3. Review Existing Molds and Tooling

The solution does not necessarily have to start with the machine. An existing mold that can be returned to production, or available tooling compatible with the required part, may provide another starting point. Before moving forward, manufacturers should verify mold dimensions, number of cavities, material previously processed, condition, press requirements, and any potential modifications. This information helps eliminate options that do not fit before capital is committed and allows the search to focus on assets with greater potential for the project.

4. Evaluate Modifications That Could Increase Productivity

The fourth alternative is to determine whether the bottleneck can be addressed by modifying the tooling or current production setup. Cavitation, cycle time, cooling, mold performance, and the relationship between the mold and machine can limit output even when sufficient tonnage is available. A viable modification may change the effective capacity of a production line without making an additional machine the only solution. However, any modification should be evaluated against the required volume, the cost of the work, and the time available to begin production.

Compare the Options Before Making a Decision

The most expensive alternative is not always the right one, and the least expensive option does not necessarily result in the lowest total cost. When a new order arrives, the real challenge is often finding an option that can be integrated into the operation within the required timeframe. Comparing existing capacity, used machinery, available tooling, and potential modifications makes it possible to evaluate each path in terms of investment, compatibility, and timing. The goal is not simply to buy another asset. It is to determine which alternative can provide the capacity needed to support the new project.

Before Turning Down the Order, Explore the Available Options

If a new order exceeds your current production capacity, turning it down does not have to be the first response. With 37 years of experience in the plastics industry, Molds Unlimited can help you explore available molds, machinery, and tooling to evaluate capacity alternatives for your next project.

Send us your requirements and learn more about the options currently available.